Line of South-North Water Diversion Project Abstract: Located in the southeast of Qingzang Plateau, the project of Water Diversion from the South to the North is planned to divert 17 billions m3 of water from the Upper Yangtze River, and deliver the water via the tunnels across the watershed ridge of Bayankala Mountain to the Upper Yellow River. The main characteristics include: Explained are the necessaries the divert water to the draught and semi-draught area of Northwest Region of China and to the Yellow River of water shortage. The Researches on the project have been done since the 1950s and the technical schemes of the project of water diversion from the South to the North. Key words: planning on inter-watershed diversion of water; main characteristics; western route of water diversion from South to North. 上一页 [1] [2] [3] [4]